Construction Sites (with difficult power distribution)

By adopting InnoX Energy's integrated all-liquid-cooled energy storage system, the power grid/diesel generator and the energy storage system will supply power simultaneously at the moment when the impact load is started. This reduces the impact during startup, thereby reducing the power distribution capacity of the grid or the capacity of the diesel generator and saving costs. At the same time, the addition of the energy storage system enables the diesel generator to operate stably at the optimal load state, improving the operating efficiency of the diesel generator and saving fuel.

BackgroundIntroductionBusiness Values Product Portfolio
Background

The power distribution cost at construction sites is high. When impact loads are started, the current surge is 3 to 5 times that during normal operation. In traditional solutions, the power grid needs to be configured according to the maximum power of the load, or diesel generators need to be installed, resulting in high costs. In addition, the impact loads at construction sites cause significant fluctuations in the operation of diesel generators, leading to low efficiency and high fuel consumption.

Introduction

By adopting InnoX Energy's integrated all-liquid-cooled energy storage system, the power grid/diesel generator and the energy storage system will supply power simultaneously at the moment when the impact load is started. This reduces the impact during startup, thereby reducing the power distribution capacity of the grid or the capacity of the diesel generator and saving costs. At the same time, the addition of the energy storage system enables the diesel generator to operate stably at the optimal load state, improving the operating efficiency of the diesel generator and saving fuel.

Business Values
Cost Savings
Cost Savings

Save the power distribution cost or the cost of the supporting diesel generator.

Fuel Savings
Fuel Savings

The connection of the energy storage system enables the diesel generator to operate within the optimal load range, resulting in low fuel consumption.

Peak-valley Arbitrage
Peak-valley Arbitrage

During the daily operation of the energy storage system, it can shave peaks and fill valleys according to the load conditions and conduct peak-valley arbitrage.

Product Portfolio
  • Liquid-cooled ESS

    Liquid-cooled ESS

    241kWh Large-surface Liquid Cooled

  • All-liquid-cooled ESS

    All-liquid-cooled ESS

    Fully Liquid Cooled Battery Pack

  • Distributed Modular ESS

    Distributed Modular ESS

    Safe and Reliable


    Phone: +86 15945779939 E-mail: sales01@innoxenergy.com Address: No.19 Zhuoyue Road, Longxing Town, Liangjiang New Area, Chongqing, China
  
CopyRight © 2025 InnoX Energy Technology B.V. All Rights Reserved.