The power distribution cost at construction sites is high. When impact loads are started, the current surge is 3 to 5 times that during normal operation. In traditional solutions, the power grid needs to be configured according to the maximum power of the load, or diesel generators need to be installed, resulting in high costs. In addition, the impact loads at construction sites cause significant fluctuations in the operation of diesel generators, leading to low efficiency and high fuel consumption.